So here we go again. We started the reno on the bathroom Thursday. We are hoping to have it totally done by next Friday. So far we have ripped out the vinyl shower, floor, cabinets and portions of a wall. Later today we are hoping to tear out the pocket door that is off it's track and replace it with a regular swinging door. We like the pocket door, but repairing it or replacing it would require we rip out the entire wall. We chose the lesser of 2 evils and are going with a regular door. We are doing a walk-in shower with tile walls to the ceiling. We are also building a tile bench as well as niches for toiletries. The tricky part will be making the floor, bench and niche slant at just the right angle so that the water drains out. Stay tuned for updates this week. It's gonna be amazing!!!!
1 comment:
I can't wait to see the finished product!!
Post a Comment